Skip to content
Patmos Engineering, Inc. logo

PATMOS Engineering Services, Inc.

DER Certification | Hardware Development | DO-254/178C Training

Tammy Reeves | LinkedinPatmos Engineering | FacebookContact Patmos

DO-254 | DO-178C | ARP 4754A
About | Contact
Request Quote
Primary Menu
  • Home
  • HW Development
  • Certification
  • Training
  • Tools/Templates
  • Advice/Blogs
  • Policy Docs
  • Menu

Category: DER Advice

Post navigation
Newer posts →

Why Do Target Testing?

Posted on March 26, 2018 by Patmos Engineering, Inc.

A common inquiry from applicants is whether they have to do target testing, why, and how much to do. DO-254, along with FAA Order 8110.105, both emphasize the expectation that Continue Reading →

Posted in DER Advice | Tagged AEH, Airborne Electronic Hardware, ASIC, DO-254, FAA Order 8110.105, FPGA, PLD, target testing

Are Checklists Really Necessary?

Posted on March 26, 2018 by Patmos Engineering, Inc.

No one really likes filling out checklists for reviews. So do you have to have them?  Truthfully, the answer is no. But for practical reasons, I’d like to say “Yes” Continue Reading →

Posted in DER Advice | Tagged checklists, reviewers, test results

Mistake 4: The Purpose of Traceability

Posted on March 26, 2018 by Patmos Engineering, Inc.

The # 4 mistake is…Not Understanding the Purpose of Traceability. DO-254 is a requirements-based process. As part of this process, requirements must be captured and validated, and then traced (via Continue Reading →

Posted in DER Advice | Tagged DO-254, traceability

Mistake 3: Improper Retention of Verification Results

Posted on March 26, 2018 by Patmos Engineering, Inc.

The #3 common mistake…Improper Retention of Verification Results DO-254 has several objectives related to verification, which can be accomplished through reviews, analysis or test. The results of these activities must Continue Reading →

Posted in DER Advice | Tagged DO-254, documentation, records, verification

Mistake 2: Treating Configuration Management as an “End of Process”

Posted on March 26, 2018 by Patmos Engineering, Inc.

The # 2 mistake is…Treating CM as an “End of Process” Activity DO-254 requires Configuration Management (CM) and control of the data not only during the service life but also Continue Reading →

Posted in DER Advice | Tagged change control, CM, Configuration Management, data storage, DO-254, FPGA/PLD/ASIC, HC1

Mistake 1: Planning After the Fact

Posted on March 26, 2018 by Patmos Engineering, Inc.

Don’t Make These Mistakes! The next few blogs are dedicated to discussing the top mistakes that are commonly encountered in the compliance process. The # 1 mistake is…Creating Plans After Continue Reading →

Posted in DER Advice | Tagged Certification Review Items, COTS IP, DAL, DO-254, EASA, FAA, mistakes, planning

Why Hire a FAA DER?

Posted on March 26, 2018 by Patmos Engineering, Inc.

Nobody likes to wait for things they need.  Waiting can be a waste of time, and time is money.  A key value of having a Designated Engineering Representative (DER) is Continue Reading →

Posted in DER Advice | Tagged Airborne Electronic Hardware, DER, FAA

Preparing for SOI-3

Posted on March 26, 2018 by Patmos Engineering, Inc.

Process assurance is a really important role in a DO-254 program. If done well, it can save companies a lot of time and expense by making SOI audits go smoothly and Continue Reading →

Posted in DER Advice | Tagged DO-254, Hardware verification Plan, HVP, Process Assurance, SOI-3, VCI, Verification Control Index

Understanding the Reason for DO-254

Posted on March 26, 2018 by Patmos Engineering, Inc.

Many times I hear engineering and management teams complain that DO-254 costs them a lot of time and a lot of money. But when I get to review the work Continue Reading →

Posted in DER Advice | Tagged compliance, DAL, Design Assurance level, DO-254, EASA, FAA
Post navigation
Newer posts →

Search this site

Subscribe to DER ADVICE via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

PATMOS ENGINEERING

  • Home
  • DER/Certification Services
  • Hardware Development
  • DO-254 Training & DO-178C Training
  • Tools and Templates
  • Overarching Properties
  • DER Advice
  • DO-254
  • DO-178C Software Considerations
  • ARP 4754A Development
  • Menu

ABOUT PATMOS

  • About Patmos Engineering
  • Women’s Business Enterprise Certification
  • Tammy Reeve
  • Jeff Reeve
  • Dick Pado
  • Dave Newton
  • Paul Carrick
  • Michelle Lange
  • Menu

CONTACT

PMB#224
5500 Olympic Drive Suite
H-105
Gig Harbor Wa 98335
Phone/fax:
425-427-1956
Contact

Privacy Policy

Footer Menu
  • Home
  • HW Development
  • Certification
  • Training
  • Tools/Templates
  • Advice/Blogs
  • Policy Docs
  • Menu
Copyright © 2021 PATMOS Engineering Services, Inc.. All Rights Reserved.
DUNS ID #155113033