DO-178C/DO-254 Advice Blogs

The Top 3 Types of Information Typically Missing from DO-178C Plans

What are the most common things missing from DO-178C plans? A template can help. Continue Reading →

Live Chat Mar 30 & 31: Women in Aerospace Engineering

Tammy Reeve, President – Patmos Engineering Services and Airworthiness Certification Services, LLC will be joining the two Continue Reading →

Is it OK to Provide or Use Hardware COTS IP in Avionics Designs?

The use of commercial off-the-shelf intellectual property (COTS IP, also known as IP cores or Continue Reading →

How AMC/AC 20-189 Stops “Un-Accomplishment Summaries” in DO-178C or DO-254 programs

How Can the New AMC/AC 20-189 Help Manage Problem Reports in DO-178C and DO-254 Projects? Continue Reading →

Overarching Properties

The Overarching Properties initiative seeks to provide flexibility and efficiency in the certification process. “Overarching Continue Reading →

What is the Impact of AMC 20-152A on Your DO-254 Project?

I have some exciting news for all the companies, teams and engineers working on airborne Continue Reading →

The Implications of Order 8110.105A

The regulatory world is in constant flux. This is due to ongoing change in technology Continue Reading →

Bottom Up vs. Top Down

One of the things I see and hear is that we can “finish that certification Continue Reading →

Tool Controlled Artifacts and Evidence

Section 7 of DO-254 tells us “The configuration management process is intended to provide the Continue Reading →

What are Streamlining Processes?

This blog is a little different from my past ones. I was invited to participate Continue Reading →

Why Do Target Testing?

A common inquiry from applicants is whether they have to do target testing, why, and Continue Reading →

Are Checklists Really Necessary?

No one really likes filling out checklists for reviews. So do you have to have Continue Reading →

Mistake 4: The Purpose of Traceability

The # 4 mistake is…Not Understanding the Purpose of Traceability. DO-254 is a requirements-based process. Continue Reading →

Mistake 3: Improper Retention of Verification Results

The #3 common mistake…Improper Retention of Verification Results DO-254 has several objectives related to verification, Continue Reading →

Mistake 2: Treating Configuration Management as an “End of Process”

The # 2 mistake is…Treating CM as an “End of Process” Activity DO-254 requires Configuration Continue Reading →

Mistake 1: Planning After the Fact

Don’t Make These Mistakes! The next few blogs are dedicated to discussing the top mistakes Continue Reading →

Why Hire a FAA DER?

Nobody likes to wait for things they need.  Waiting can be a waste of time, Continue Reading →

Preparing for SOI-3

Process assurance is a really important role in a DO-254 program. If done well, it can Continue Reading →

Understanding the Reason for DO-254

Many times I hear engineering and management teams complain that DO-254 costs them a lot Continue Reading →